Supt. - Mechanical Af/Ac/Whr System/Sap
Amman Mineral · Sumbawa Barat, West Nusa Tengg, NB, Indonesia
Sekilas tentang pekerjaan ini
Supt. - Mechanical Af/Ac/Whr System/Sap di Amman Mineral mengawasi pemeliharaan mekanis peralatan di kompleks smelter tembaga dan Sulphuric Acid Plant. Posisi ini berlokasi di Sumbawa Barat, Indonesia; posting tidak menyebutkan tingkat pengalaman yang dibutuhkan.
Tugas utama
- Mengawasi pemeliharaan mekanis Anode Furnace, Air Conditioning Units, Waste Heat Recovery, dan Sulphuric Acid Plant.
- Memastikan kepatuhan terhadap persyaratan hukum serta standar kesehatan, keselamatan, dan lingkungan.
- Memimpin tim pemeliharaan mekanis dan mengembangkan keterampilan serta kinerja tim.
- Menyusun jadwal pemeliharaan preventif, program CBM, dan rencana shutdown bulanan serta tahunan.
Ringkasan ini dibuat dengan AI dari deskripsi di bawah. Yang berlaku adalah deskripsi lengkapnya di situs Amman Mineral.
Deskripsi pekerjaan
Production/Technical/Projects Part 1
- Oversee the mechanical maintenance of the Anode Furnace, Air Conditioning Units, Waste Heat Recovery system, and Sulphuric Acid Plant, including associated infrastructure and equipment of the Smelter and Sulphuric Acid Plant at the AMMAN Mineral Industri Copper Smelter complex at Sumbawa Island, Indonesia, in order to maximize plant and machinery uptime.
- Ensure compliance with all statutory requirements and adherence to health, safety, and environmental standards related to mechanical maintenance activities.
- Lead the mechanical maintenance team to embed a culture of quality, safety, and sustainability by monitoring team performance and upgrading skills through continuous development.
- Oversee the preparation of preventive maintenance schedules, condition-based maintenance (CBM) programs, and monthly as well as annual shutdown plans for all mechanical equipment related to the Anode Furnace, Air Conditioning Units, Waste Heat Recovery system, and Sulphuric Acid Plant, in coordination with the respective operations teams.