Engineering & Supplies Coordination Long Lead Item Engineer (OLNG)

INPEX Masela Ltd. · Jakarta, Indonesia

Terverifikasi masih aktif di situs karier resmi INPEX Masela Ltd. pada 21 November 2026

Lamar

Sekilas tentang pekerjaan ini

INPEX Masela Ltd. membuka posisi Engineering & Supplies Coordination Long Lead Item Engineer (OLNG) di Jakarta, Indonesia. Posisi ini berfokus pada koordinasi pengadaan dan pemantauan peralatan berjangka panjang, serta ditujukan bagi kandidat dengan minimal 10 tahun pengalaman di industri Oil & Gas dan pengalaman proyek fasilitas LNG.

Tugas utama

  • Menyusun daftar peralatan berdasarkan prioritas jadwal dan biaya.
  • Mengompilasi data teknis, jadwal, dan biaya untuk menyiapkan justifikasi serta risiko.
  • Menyusun dokumen persyaratan pengadaan untuk peralatan kritis.
  • Mendukung komunikasi vendor dan kesepakatan novasi Purchase Order kepada kontraktor EPC.
  • Memantau beban produksi Long Lead Items dan mengangkat potensi keterlambatan.

Kualifikasi utama

  • Sarjana Teknik atau Sains Teknik; gelar lanjutan lebih disukai.
  • Minimal 10 tahun pengalaman di industri Oil & Gas.
  • Wajib memiliki pengalaman proyek fasilitas LNG.

Ringkasan ini dibuat dengan AI dari deskripsi di bawah. Yang berlaku adalah deskripsi lengkapnya di situs INPEX Masela Ltd..

Deskripsi pekerjaan

JOB ROLES

  • Develop the equipment list and group the list based on schedule and cost priority.
  • Compile all technical, schedule and cost data, and develop the justification, risk and opportunity to be presented to INPEX management, JV and SKKMIGAS.
  • Develop the procurements requirements documents for the critical items (equipment)
  • Support the communication with Vendors, Develop the agreement of Purchase Order Novation to EPC Contractor as part of EPCI Contract to the selected Consortium
  • Ensure that all technical data (Data Sheet) attached to PO is already agreed and countersigned by Potential EPCI Contractors.
  • Responsible to monitor the Long Lead Items manufacturing load that may vary from time to time depending on the order received by them, raise the concern to management for intervention if there is any sign of potential delay.

QUALIFICATIONS

  • Bachelor degree in Engineering or Technical Science. Advanced degree in the above is preferable.
  • Minimum of 10 years of experience in the Oil & Gas Industry. Project experience in LNG facilities is required.

Discipline

All Engineering

Posting Date

21 December 2024

Lowongan ini diambil dari situs karier resmi INPEX Masela Ltd.. Lokr tidak memproses lamaran: kamu melamar langsung di situs perusahaan, dan info terbaru tentang lowongan ini ada di sana.

Lowongan lain di INPEX Masela Ltd.

Lowongan Manufaktur di perusahaan lain